Talking about the Preparation of Multi-pole Type Sliding Wire before Installation

Talking about the preparatory work before installation of multi-pole type trolley wire:
1, according to the terrain and factory requirements drawing installation diagram. No special circumstances can be prepared as shown below.
2. Bracket assembly. The length of each linear pipe is 4m. The span of the bracket is 1.2m or 1.5m. It can also be increased or decreased according to the site conditions. The bracket must be firm and neatly arranged.
3, installation inspection
a. Conductors should pass freely through the catheter.
b. The brush in the conductive device should be flexible and flexible, and it must be flexible and flexible.
c. Check whether there is any crack or distortion outside the catheter, and whether the guide rail joint inside the catheter is straight and smooth.
For more questions about multi-pole tube type installation, please contact us.

Drilling And Bolting Machine

A drilling and bolting machine consists of one, two or three rock drill carriages, sometimes a platform, which the miner stands on to load the holes with explosives, clear the face of the tunnel or else. The carriages are bolted onto the chassis, which supports also the miners cabin and of course the engine. Modern drilling jumbos are relatively large, there are however smaller ones for use in cramped conditions. Whereas modern jumbos usually fitted with rubber tyres and diesel-powered, there are also exist variants with steel wheels, to ride on rails and even single carriage sled-mounted ones. Electric power is also common, historic jumbos were powered by compressed air. Electricity and compressed air produce no exhaust gases, which is preferable if work is done in smaller tunnels where good ventilation is difficult.

Mining Machinery,Mining Bolting Machine,Underground Mining Machines,Drilling And Bolting Machine

NORTH HEAVY GRYPS EQUIPMENT AND ENGINEERING CO.,LTD , https://www.nhgtunnel.com