10Years Quality Warranty
*Mould NO:Â AV1067
*Size: 1/2" FxF, both sides BSP. Size 1/2"~4" FF/FM/MM avaiable
*Medium: Water, oil, gas
*Working pressure: PN25
*Surface treatment: Nickel plated, chromed or brass color aslo can be done
*Material: Brass.(CU>57%,Pb<2.5%) (HPb59-1, CW602N, CW614N. CW617N)
*Skill :Forging and plating
*Thead standard: ISO228
**Technical Data ***Â Â
ITEM |
Designation | Â Materials |
 1 |  Handle |  Steel Q235 |
 2 |  Stem |  Brass CW627 N accoring to EN12165 |
 3 |  Body |  Brass CW627 N accoring to EN12165 Nickel |
 4 |  Stem |  Brass CW627 N accoring to EN12165 |
 5 |  O-ring |  NBR |
 6 |  Plug |  Brass CW627 N accoring to EN12165 Nickel |
 7 |  Bonnet |  Brass CW627 N accoring to EN12165 Nickel |

**Products Types**

**Company & Process ***Â Â


***Â OUR SERVICESÂ

Samples:Â Â
1) we can make the samples according to customer's samples or designs.
2) Our designer team can finish the samples timely, the exact sample delivery time depends on thesample's style, usually in 15 working days.
3) For New design samples, the buyers have to pay for the relative model fee. (When your order reach a certain amount, we will return back the model fee to you
Price Terms:
FOB, CNF,CIF.etc.
WE ACCEPT Â MANY RATE , SUCH AS RMB, US DOLLAY, EUR, KORAD, POUND..ETCÂ
Payment Terms:Â
1) T/T, 30% T/T deposit before production, pay the balance before shipment.
2) L/C at sight (for large quantity order)
3) 100% T/T in advance,  D/P
Order and Mass Production:
1) We will send PROFORMA INVOICE to you when the order is confirmed.
2)  We will start to have mass production when confirm our sample and 30% T/T deposit received.
3)  Quality is under the control and supervision during the production.
4)  Packing information will be confirmed before the production finished, If no special requirment, using our
normal package.

 Quality control and inspection:
1)Â Will be check by QC when Material & accessories inspection up arrival
2)Â In line control on Each StepÂ
3)Â Every one valve will be comprehensive review before packing
4) Sales will be spot check before shipping
 5) Third Party inspection Such as CE, SABS and so on
 6) Original authorization through ISO9001:2008
Small Cement Silo
1.The cement silo must be erected by a special crane when working. Then place it on the prefabricated concrete and check the verticality between cement silo and the horizontal level. Then weld the bottom of the silo with embedded parts firmly.
2.After the silo is fixed, bulk cement truck transports the cement to site. Then conveying the cement in truck to cement silo by the air pressure of the truck.
3.In the process of conveying cement to storage bin, the operator should press the button of dust collector uninterruptedly to shake off the cement attached to the duster bag to prevent blocking and silo explosion.
4.Once the bag is blocked and the pressure in the silo exceeds the safety pressure value , then open the safety pressure valve to release the inner pressure, to avoid the explosion accident.
Cement silo working principle:
1.Bulk cement truck transports the cement to the site.
2. Conveying the cement in truck to cement silo by the air pressure of the truck.
3. Conveying the cement in cement silo to the Concrete Mixer by the Screw Conveyor.
Small Cement Silo,Silos Batching Plant,Silo For Concrete Batching Plant,Silos Concrete Mixer
Zhengzhou XinFeng machinery manufacturing Co. Ltd , https://www.xfmachinery.com