The second-phase chemical fertilizer in Fudao saves 4.9 billion yuan in investment through completion acceptance, creating the shortest construction period for the same type of international equipment.

On June 23, CNOOC Natural Gas Fertilizer Project (Fudao Phase 2) passed the inspection and acceptance of the National Development and Reform Commission, China National Offshore Oil Corporation, and Hainan Province and other relevant organizations and officially handed over production. The construction period of the project is only 21 months, creating the shortest construction period of the same type of international equipment, saving 490 million yuan in funds.

According to Yang Yexin, general manager of China National Offshore Oil Corporation, CNOOC Natural Gas Fertilizer Project (Fujishima Phase II) uses Dongfang 1-1 gas field natural gas as raw material and is designed to produce 450,000 tons of synthetic ammonia and 800,000 tons of large-particle urea annually. This project is a national key construction project of the “Tenth Five-Year Plan” and is also the largest single urea plant in China. It is the first downstream project to be built by CNOOC.

The project covers an area of ​​53 hectares, including a green area of ​​20 hectares. The main project of the project started construction in January 2002. Chemicals were fed on September 12, 2003. On September 30, 2003, qualified products were produced two months ahead of schedule, and it took only 18 days from the start of production to the production of qualified products. After successful commissioning, after one year of trial production, the production capacity of the device reached 105% of the design capacity, and the production cost was only 98.3% of the contracted value. The preliminary design estimate for the project is 2.686 billion yuan, and the actual investment is 2.19 billion yuan, saving about 490 million yuan.

Last year was the first year of trial production of this project. In the whole year, a total of 841,700 tons of large-granule urea was produced. It reached the record of the designed production capacity in the first year after the domestic large-scale fertilizer plant was put into operation, and the product quality and “three wastes” emission targets were all met. Contract requirements. In April last year, the site was inspected and approved by the Chemical Industry Engineering Quality Supervision Station. There were a total of 106 projects in the project, with a pass rate of 100% and an excellent and good rate of 92.5%. The overall project quality was rated as excellent. At the same time, the project also won the 2004 National Chemical Industry Quality Engineering Award.

Applicable to the construction of real estate, parks, bridges and tunnels, construction of harbors and airports, construction of railways and highways, construction of power and communication engineering, construction of dams and water conservancy projects, energy production, and storage Construction and construction, construction of agricultural production, reserve engineering, construction of municipal infrastructure, greening projects, etc.

Rotary Drilling Rig

Boring Hole Drill Rig,Diesel Engines Boring Rig,Hydraulic Drilling Rig,Crawler Drilling Rig

SHANDONG YAHE CONSTRUCTION MACHINERY CO., LTD , https://www.pilingdriver.com