2018 The 4th Energy Internet Industry Development Summit Forum will be held in Shanghai in April!

To promote the sustainable development of comprehensive services in energy consumption, supply, technology, and innovation, the “2018 4th Energy Internet Industry Development Summit Forum” will be jointly organized by the Energy Internet real-time expert think tank and Energy eLive and Shanghai Aiyi Business Consulting Co., Ltd. Held in Shanghai in April. This year's Energy Internet Conference will focus on the interconnection of energy Internet value chain resources, and will commend companies that have performed outstandingly in fields such as energy storage, distributed microgrid, integrated energy services, and power big data in the past year.
At the 3rd Energy Internet Summit in November 2017, the Resource Matching Conference conducted a total of 268 collaborations between 5 major solution providers and 37 project parties, with 26 initial cooperation intentions. The data shows that the resource matching conference has achieved remarkable results. Therefore, the 4th summit will continue to hold a resource matching conference and expand the scale. It will invite more than 60 enterprises in the transmission, distribution, distribution, sale and use of the energy Internet value chain to include Traditional power generation companies, new energy companies, electric vehicle manufacturers, energy storage system integrators, professional design institutes, equipment manufacturers, software services, Internet companies, energy efficiency managers, and natural gas distributed energy equipment vendors, EPCs, gas companies, and industrial parks The committees, financial investors, etc., participate in the joint connection of resources to achieve efficient and deep integration of resources in the energy Internet industry, so that participating companies can truly reach cooperation and establish long-term and stable links.
In addition to the first day of the resource matching conference, the summit will set up four parallel sub-forums on the second day: energy storage technologies and applications, distributed energy and microgrids, innovative integrated energy services, and energy and power big data. The topic will be more focused. Guests participating in the conference can obtain more in-depth industry development trends and trends in the industry's well-known companies and product development trends.
At the same time, in order to encourage companies to continue to innovate and breakthrough in the industry, this year's conference will also set an annual awards ceremony, will invite 60+ industry-renowned media to follow-up reports and exclusive interviews, to provide award-winning companies with high-frequency display products, Projects, technology opportunities, increase brand exposure.
The Energy Internet Industry Development Summit Forum has been dedicated to providing efficient information exchange platforms and cooperation opportunities for companies and industry professionals in the fields of energy storage, distributed microgrid, integrated energy services, and power big data. Summit long-term recruitment of strategic partners, learn more about the General Assembly http://, sponsorship, title and attendance, please contact Ms. Chen.

Construction Hoist Steel Structure

Construction Hoist Steel Structure means the construction hoist spare parts like Construction Hoist Mast Section, Passenger Hoist Cage, Construction Hoist Wall Tie and so on.

The length of each mast section is 1508mm, the rack is fixed on the mast by three bolts and it can be exchanged. For the single cage hoist there is only one rack on the mast section, and the mast section can be used for the double cages hoist by increasing one rack. The section of the mast is diverse, select one type section according to different hoist. The mast sections are bolted together with M24 bolts and nuts to form mast. The mast is tied to the building with tie-in and is the guide rail of the cage. According to the user`s or circumstance`s request, surface of mast is hot dip galvanized, which can prevent it rusting.

The tie-in(wall tie) is the linked part between mast and building, to keep the stabilization of the mast. Distance between the tie-in is about 6~9m alone the mast. There are several types of tie-in. Select one of them according to need, tie-in can adjust the vertical of mast in definite ranges. According to the user`s or circumstance`s request, surface of the tie-in is hot dip galvanized, which can prevent it rusting.

The cage dimension(L×W×H)(m): 3×1.5×2.5. We can also manufacture cages of other size according to the user`s needs. The material of the cage and the door material can be steel wire weave, aluminum-plastic panel, punched-plate, figured aluminum board or other type according to user`s needs. The gate is equipped with drawing gate,include small turn over gate.




Construction Hoist Mast Section,Building Hoist Mast Section,Passenger Hoist Cage,Construction Hoist Wall Tie, Construction Hoist Anchorage Frame

SHEN YANG BAOQUAN BUSINESS CO., LTD , https://www.sczenghui.com