Hubei Qianjiang Water Authority Inspection Pump Station to make preparations

Since the beginning of spring, Hubei Qianjiang Municipal Water Affairs Bureau has been well-established in the early stage and has been actively preparing for flood prevention. It has also provided overhaul and maintenance of the sluice gate pump station in the city to ensure that it is prepared and safe. Up till now, the overhaul work of the sluice gate pump station has been completed to solve the machinery and equipment failures and failures in the automation system.

Recently, the bureau once again organized a special class to complete the maintenance of each sluice gate pump station. In order to ensure that the city's large and small pump stations enter the flood season with good working conditions, pre-drilling inspections and testing machines were conducted separately. The inspection focused on the responsible persons of the pumping stations, the implementation of the rules and regulations, and the maintenance of the pumping stations. The on-site equipment and automation systems of the pumping stations were inspected and registered one by one. At the same time, it is required that each pumping station should be prepared to do a good job of guarding against obstruction and arrogance in order to grasp the ideological mobilization of cadres and staff members, so that they can make early preparations and start operations early to overcome the paralysis and eliminate hidden dangers.

Belt Grinder

Belt Grinder,Belt Grinder Kit,Industrial Belt Grinder,Belt Grinder Machine

WEISS MACHINERY CO., LTD. , https://www.weissmachinery.com